Saturday, May 3, 2008

Garvey

I just missed Paul tapering the legs for a large Walnut Console Table. Notice the dado at the bottom of the leg to support the shelf. You can also see the mortise at the top of the leg to accept the rails. Both of these steps must be done before tapering while the leg is square.










Paul is now sanding the saw marks on the legs. He must be very careful not to sand the square flat surface at the top of the leg where the rail fits into the mortise.













I missed a lot of steps throughout the process, but this is the table clamped up next to Paul's bench.










Nothing like some hand sanding to finish up a job.















Beautifully finished table ready for our shipper to pick up.